Pws 2.3 Plus User Manual

Pws 2.3 Plus User Manual 3,7/5 8119 votes

110XiIIIPlus Industrial Printer Support This printer is discontinued. We may offer drivers, firmware, and manuals below for your convenience, as well as online tech support. The PWS 2.3 PLUS Portable Working Standard is a three-phase portable electronic meter test unit, used for testing single and three-phase electricity meters on site. The PWS2.3 PLUS allows checking of all meter installation parameters and associated circuits. The PWS 2.3 PLUS, with.

Installation 5 2.3.1 Cable Grounding Except for the power cord, all cables routed through the cord grips should be grounded against the indicator backplate. Do the following to ground shielded cables: • Use the lockwashers, clamps, and kep nuts provided in the parts kit to install grounding clamps on the backplate studs adjacent to cord grips. Install grounding clamps only for cord grips that will be used; do not tighten nuts. • Route cables through cord grips and grounding clamps to determine cable lengths required to reach cable connectors. Mark cables to remove insulation and shield as described below: • For cables with foil shielding, strip insulation and foil from the cable half an inch (15 mm) past the grounding clamp (see ).

Fold the foil shield back on the cable where the cable passes through the clamp. Ensure silver (conductive) side of foil is turned outward for contact with the grounding clamp. • For cables with braided shielding, strip cable insulation and braided shield from a point just past the grounding clamp. Strip another half inch (15 mm) of insulation only to expose the braid where the cable passes through the clamp (s • For load cell cables, cut the shield wire just past the grounding clamp.

Shield wire function is provided by contact between the cable shield and the grounding clamp. • Route stripped cables through cord grips and clamps.

Ensure shields contact grounding clamps as shown in ighten grounding clamp nuts. • Finish installation using cable mounts and ties to secure cables inside of indicator enclosure. Grounding Clamp Attachment for Foil-Shielded and Braided Cabling Figure 2-3. IQ plus 355 CPU and Power Supply Board $PSEHSJQ *OTVMBUFEDBCMF 'PJM TJMWFSTJEFPVU (SPVOEJOHDMBNQ 4IJFMEXJSF DVU -FOHUIPGGPJMCFGPSFGPMEJOH CBDLPODBCMFJOTVMBUJPO $VUJOTVMBUJPOIFSF GPSGPJMTIJFMEFEDBCMFT #SBJE $VUJOTVMBUJPOIFSF GPSCSBJEFEDBCMFT /05&*OTUBMMMPDLXBTIFST mSTUBHBJOTUCBDLQMBUF VOEFSHSPVOEJOHDMBNQ 5S B O T G P S N F S #3 $ 73 +.1 $.&$$' $%*(*5'- 7 5&45 +        4&3*'-$0.%*(*5'-*/ &%15 (/% &%13 13.' 13 5 */  */  ' ' #MVFXJSF +1 '/'-0( (/% '/'-0( 7 5&45 '/'-0( o7 5&45 (/% (/% +1 +1 73 $ 73 $ o,FZQBE$POOFDUPS + &&130.

Muharrem ahmeti gon kalaja 2014. Lyrics for Goni & Endri Kalaja by Muharrem Ahmeti. Hajde gon kalaja,, ti mor djal zotni'' ty te ndjen tallavaja ke kompleks kalaja 2x,,, hajd. Type song title, artist or lyrics Top lyrics Community Contribute. Mix - Muharrem Ahmeti - Goni & Endri Kalaja (Official Video HD) YouTube MUHARREM AHMETI & MIRI & ERMIN LENA MAGDALENA - Duration: 3:14. Eran Production 2,779,352 views.

' %  $ P O W F S U F S +1 #SPXO X JSF.JDSPQSPDFTTPS 9 -&% %3*7&3 -&% %3*7&3 6 6 5PTFUVQTXJUDI 0/ 0' 4&5*41 + o&9$ &9$ o4&/4& 4&/4& o4*( 4*(       -0'%$&--$0//&$503 +.1 0' 0/ -0'% $&-- $0.1.